This was posted from @DaveMalby on twitter.

http://twitter.com/DaveMalby/status/15958890651

I couldn’t give a full answer as I wanted to on twitter. I would say at least 18 workers.

6 to figure out how to fill in the hole.

6 to figure out what to fill the hole with.

6 to actually fill the hole.

Leave a Reply

(required)

(required)

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

CommentLuv badge

© 2012 Wizzard's Blog Suffusion theme by Sayontan Sinha